No price range yet · latest SEC filing Aug 21, 2026.
Pinch-zoom for details.
Engineering, procurement and construction for power and data-center projects: utility-scale solar, battery storage and high-voltage lines.
Fiscal year
1st half
Fiscal year
1st half
| $ | FY2024 | FY2025 | YoY | H1 2025 | H1 2026 | Change |
|---|---|---|---|---|---|---|
| Revenue | 443M | 739M | +67.0% | 451M | 308M | −31.7% |
| Net result | (9.00M) | 60.6M | n/m | 43.2M | 35.4M | −18.1% |
| $ | FY2024 | FY2025 | YoY |
|---|---|---|---|
| Revenue | 443M | 739M | +67.0% |
| Net result | (9.00M) | 60.6M | n/m |
| $ | H1 2025 | H1 2026 | Change |
|---|---|---|---|
| Revenue | 451M | 308M | −31.7% |
| Net result | 43.2M | 35.4M | −18.1% |
Values as filed, shortened (K = thousand, M = million, B = billion); losses in parentheses. Change columns compare each period with the same period a year earlier; a bigger loss shows as a negative change. Green is better for the company, red worse; n/m where the sign flips.
The filing's own risk-factor headings, shortened.
The filing's own strategy headings, shortened.
Source: CoVolt Power, Inc.'s Form S-1, filed with the SEC on Aug 21, 2026 (preliminary prospectus). Figures are as filed; changes are worked out from them. Not investment advice.
Pinch-zoom for details.
10KDecoder (10-K Decoder): decode SEC 10-K filings and IPO prospectuses into dashboards and infographics.
Infographic
Double-tap: full screen or back